{"id":18018,"date":"2024-10-15T14:35:36","date_gmt":"2024-10-15T12:35:36","guid":{"rendered":"https:\/\/www.gsegroup.com\/?p=18018"},"modified":"2026-06-22T17:04:40","modified_gmt":"2026-06-22T15:04:40","slug":"a-transformational-trend-off-site-construction","status":"publish","type":"post","link":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/","title":{"rendered":"A transformational trend : off-site construction"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>Standardisation has long played a key role in the construction industry, where many components are manufactured to established standards. Now, forward-thinking architects are widely embracing the practice of off-site construction, transforming the conventional approach.<\/em><\/strong><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Originally intended for industrial facilities, prefabricated structures have broadened their appeal to a broad variety of buildings and applications \u2013 from simple retail spaces to the most complex projects. This transformation marks a major shift towards innovative construction methods that capitalise on the engineering and design excellence of prefabricated components.<\/em><\/strong><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>The practice of off-site construction represents a new way of working on buildings, reflecting the industrialisation of construction. According to the&nbsp;<\/em><\/strong><a href=\"https:\/\/www.bati-today.com\/www.bati-today.com\/w\/pdf\/batimatcp-hors-site-avril-2024-1.pdf?VersionId=1714634790.363586\"><strong><em>3<sup>rd<\/sup> edition of the French annual survey<\/em><\/strong><\/a><strong><em>&nbsp;of off-site construction, which covers French players in this sector, 44% of professionals surveyed claim to have adopted this method in 2023, up from 31% in 2022.<\/em><\/strong><\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">What is off-site construction?<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Off-site construction, also known as modular construction, is a process that involves prefabricating a building\u2019s components in a plant before assembling them on the construction site. Each element, like the pieces of a jigsaw puzzle, is delivered to the site in an advanced state of completion, minimising construction times. This method uses a variety of materials, the most common being concrete, metal (steel structures) and wood (glulam for the structure).<\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Prefabrication is becoming the new standard on construction sites<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">GSE, a subsidiary of GOLDBECK, is a leader in the turnkey construction of commercial real estate and in the manufacture of steel and concrete components. Off-site construction, carried out in GOLDBECK plants, is an innovative, fast-growing approach. Unlike conventional on-site construction, it involves manufacturing modules in plants in Europe and assembling them on site, according to the group\u2019s various activities in the industrial, residential, education and health sectors. This approach increases speed, quality and environmental performance, offering a sustainable and effective solution to the challenges facing the construction industry.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">With this approach, design, detailing and manufacturing are carried out simultaneously, reducing in particular the overall duration of multistorey projects. Prefabricated components are ready for rapid on-site assembly, reducing construction time. Our multistorey buildings take about 12 months to build.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Of the 1,136 professionals surveyed, 90% said that the primary benefit of off-site construction was the reduction in construction times (up from 85% in 2022). In addition, 81% stated that this method also helps to reduce the environmental impact of construction. The growth potential of off-site construction is considerable, with an average annual increase of 25% to 30% worldwide. These figures testify to the strong interest in this approach.<\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Why go off-site?<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Besides meeting your project\u2019s technical and aesthetic requirements, the off-site approach offers great flexibility in terms of design and customisation. Our engineers and architects streamline the construction process by optimising the use of prefabricated elements. What\u2019s more, thanks to <a href=\"https:\/\/www.gsegroup.com\/en\/articles-en\/group-en\/bim-3d-project-modeling-a-plus-or-a-must\/\">Building Information Modeling<\/a> (BIM) and our team\u2019s expert advice, we can considerably improve the precision of execution and the efficiency of the works.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-src=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/09\/FOURPARKS_BIM-1024x576.jpg\" alt=\"\" class=\"wp-image-18035 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;width:674px;height:auto\" data-srcset=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/09\/FOURPARKS_BIM-1024x576.jpg 1024w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/09\/FOURPARKS_BIM-300x169.jpg 300w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/09\/FOURPARKS_BIM-768x432.jpg 768w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/09\/FOURPARKS_BIM.jpg 1520w\" data-sizes=\"auto\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" data-original-sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Off-site construction currently accounts for just 1% of the new build market in France. By comparison, the method is much more widespread in English-speaking countries, where it makes up 50% to 60% of newbuilds, depending on the asset category. In Scandinavian countries, the popularity of off-site construction is even higher.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">However, the situation in France is set to change. The share of off-site construction is expected to reach at least 9% by 2031. This forecast illustrates the considerable interest and growth potential of this approach, which will play a much bigger role in the French construction industry.<\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Off-site, sustainable or ecofriendly ?<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">To achieve our collective goals of urban densification and carbon reduction, it&#8217;s necessary ensure that our real estate developments are sustainable \u2013 including by building up rather than out. It is essential to improve the impacts of both the materials used and the construction methods themselves.. Off-site construction is an effective solution to help mitigate a project\u2019s carbon footprint. By reducing the need to transport materials and labour, it limits greenhouse gas emissions. What\u2019s more, prefabricated components are robust and durable, giving buildings a longer life cycle.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">From the environmental perspective, our plants comply with the latest efficiency standards, with reduced energy consumption. What\u2019s more, we are better able to optimise and recycle materials at the plant than on the construction site. Not least, off-site construction causes significantly less disturbance locally, to the community and the ecosystem. For example, noise pollution \u2013 and its impact on people and wildlife \u2013 is considerably reduced.<\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Integrating prefabricated elements into our projects<\/strong><\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The increasing complexity of modern construction, combined with climate-related legislation, is pushing us to reduce our carbon footprint and optimise the use of our resources.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">In this context, it is crucial to choose sustainable materials and to consider the building\u2019s entire life cycle, over a period of 50 years. The Life Cycle Assessment (LCA) of buildings enables us to measure the carbon footprint from the laying of the foundations to demolition. Using low-carbon concrete in all the projects significantly reduces buildings\u2019 CO2 footprints.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\">In-depth studies are conducted to minimise the costs of each project. The use of standardised CEM III concrete is one way to rationalise expenditure for our clients. With the exception of the concrete slab, which is cast in place, the columns, walls, facades, staircases and other elements are prefabricated and inspected in the plants, substantially reducing the materials\u2019 carbon footprint.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"640\" data-src=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE-1024x640.jpg\" alt=\"\" class=\"wp-image-10120 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/640;width:400px;height:auto\" data-srcset=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE-1024x640.jpg 1024w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE-300x188.jpg 300w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE-768x480.jpg 768w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE-1536x960.jpg 1536w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2023\/07\/VAILOG-ORBASSANO-DALLAGE-BAS-CARBONE.jpg 2000w\" data-sizes=\"auto\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" data-original-sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div><\/div>\n<\/div>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">An innovative &amp; sustainable off-site construction project in the port of Hamburg<\/h2>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-src=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc-1024x576.jpg\" alt=\"\" class=\"wp-image-18889 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;width:674px;height:auto\" data-srcset=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc-1024x576.jpg 1024w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc-300x169.jpg 300w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc-768x432.jpg 768w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc-1536x864.jpg 1536w, https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/11\/FlyParc.jpg 1650w\" data-sizes=\"auto\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" data-original-sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">For the purposes of a real estate development in the port of Hamburg, we were faced with a shortage of space, with only one plot of land available.&nbsp;To maximise the use of this land and accommodate several users (including Airbus, Picnic, Bechtle and JYSK), we proposed to build a flexible &amp; efficient two-storey building, optimising space and logistics processes.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the challenges posed by the polluted and unstable soil of the brownfield site, compounded by the complications of COVID-19 measures, we managed to meet the construction deadline by adopting off-site construction. This approach enabled us to prefabricate the components, considerably reducing construction time and minimising environmental impacts.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The innovative project comprises two buildings with a total surface area of 128,000 m\u00b2 and a height of 25.15 metres.&nbsp;Certified BREEAM Excellent for its commitment to the environment, it stands out for its remarkable architectural features: a two-storey building with loading bays suitable for HGVs of up to 45 tonnes on the upper floor and offices on the mezzanine.&nbsp;A car park located between the ground floor and the upstairs lorry yard, accessible by a separate ramp, is built under the yard for cars.&nbsp;Two ramps ensure the smooth flow of traffic.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Both storage levels have a 10-metre clear height, with the concrete structure guaranteeing solidity and durability.&nbsp;In addition, a green belt on the fa\u00e7ade, equipped with a watering system, adds an aesthetic touch and sustainable value to the property.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project combines performance, functionality and sustainability to meet the most demanding requirements, while demonstrating the benefits of off-site construction in a complex and constraining context.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.gsegroup.com\/en\/realisation\/four-parx\/\">More on Four Parx<\/a><\/p>\n\n\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">These innovative developments are redefining construction practices by offering effective solutions to a variety of needs.&nbsp;Prefabricated multistorey buildings are highly cost-effective, offering a smart, pragmatic approach to construction, while meeting aesthetics and sustainability expectations.&nbsp;Their adaptability and versatility make these structures the future of modern architecture.&nbsp;While off-site construction is a powerful approach to achieve our goals for the future, there are still many challenges to be addressed to make construction even more responsible.<\/p>\n\n\n\n<div style=\"height:120px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Sources :<br>*Batimat, Batinfo, infos.trouverunlogementneuf.com, latribune<\/p>\n\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.gsegroup.com\/en\/project\/\">Contact us<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Standardisation has long played a key role in the construction industry, where many components are manufactured to established standards. Now, forward-thinking architects are widely embracing the practice of off-site construction, transforming the conventional approach. Originally intended for industrial facilities, prefabricated structures have broadened their appeal to a broad variety of buildings and applications \u2013 from [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":23310,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[114],"tags":[],"class_list":["post-18018","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics"],"acf":[],"yoast_head":"<title>A transformational trend : off-site construction | GSE<\/title>\n<meta name=\"description\" content=\"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A transformational trend : off-site construction | GSE\" \/>\n<meta property=\"og:description\" content=\"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"GSE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/GroupGSE\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-15T12:35:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-22T15:04:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ana\u00eblle Stoeri\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@GSEGroup\" \/>\n<meta name=\"twitter:site\" content=\"@GSEGroup\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ana\u00eblle Stoeri\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/\"},\"author\":{\"name\":\"Ana\u00eblle Stoeri\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#\\\/schema\\\/person\\\/4669bb5f522978bfdfc2c2d10302b836\"},\"headline\":\"A transformational trend : off-site construction\",\"datePublished\":\"2024-10-15T12:35:36+00:00\",\"dateModified\":\"2026-06-22T15:04:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/\"},\"wordCount\":1255,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FlyParc-1-1.jpg\",\"articleSection\":[\"Logistics\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/\",\"url\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/\",\"name\":\"A transformational trend : off-site construction | GSE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FlyParc-1-1.jpg\",\"datePublished\":\"2024-10-15T12:35:36+00:00\",\"dateModified\":\"2026-06-22T15:04:40+00:00\",\"description\":\"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FlyParc-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FlyParc-1-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/articles-en\\\/logistics\\\/a-transformational-trend-off-site-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Articles EN\",\"item\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/category\\\/articles-en\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Logistics\",\"item\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/category\\\/articles-en\\\/logistics\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"A transformational trend : off-site construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/\",\"name\":\"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise.\",\"description\":\"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d&#039;entreprise.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#organization\",\"name\":\"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise.\",\"url\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/logo_GSE.jpg\",\"contentUrl\":\"https:\\\/\\\/www.gsegroup.com\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/logo_GSE.jpg\",\"width\":500,\"height\":250,\"caption\":\"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/GroupGSE\\\/\",\"https:\\\/\\\/x.com\\\/GSEGroup\",\"https:\\\/\\\/fr.linkedin.com\\\/company\\\/gse\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/GSEgrouptv\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.gsegroup.com\\\/en\\\/#\\\/schema\\\/person\\\/4669bb5f522978bfdfc2c2d10302b836\",\"name\":\"Ana\u00eblle Stoeri\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g\",\"caption\":\"Ana\u00eblle Stoeri\"}}]}<\/script>","yoast_head_json":{"title":"A transformational trend : off-site construction | GSE","description":"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/","og_locale":"en_US","og_type":"article","og_title":"A transformational trend : off-site construction | GSE","og_description":"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.","og_url":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/","og_site_name":"GSE","article_publisher":"https:\/\/www.facebook.com\/GroupGSE\/","article_published_time":"2024-10-15T12:35:36+00:00","article_modified_time":"2026-06-22T15:04:40+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg","type":"image\/jpeg"}],"author":"Ana\u00eblle Stoeri","twitter_card":"summary_large_image","twitter_creator":"@GSEGroup","twitter_site":"@GSEGroup","twitter_misc":{"Written by":"Ana\u00eblle Stoeri","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#article","isPartOf":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/"},"author":{"name":"Ana\u00eblle Stoeri","@id":"https:\/\/www.gsegroup.com\/en\/#\/schema\/person\/4669bb5f522978bfdfc2c2d10302b836"},"headline":"A transformational trend : off-site construction","datePublished":"2024-10-15T12:35:36+00:00","dateModified":"2026-06-22T15:04:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/"},"wordCount":1255,"commentCount":0,"publisher":{"@id":"https:\/\/www.gsegroup.com\/en\/#organization"},"image":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg","articleSection":["Logistics"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/","url":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/","name":"A transformational trend : off-site construction | GSE","isPartOf":{"@id":"https:\/\/www.gsegroup.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#primaryimage"},"image":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg","datePublished":"2024-10-15T12:35:36+00:00","dateModified":"2026-06-22T15:04:40+00:00","description":"Find all information about A transformational trend : off-site construction on our website. GSE supports your commercial real estate projects from beginning to completion.","breadcrumb":{"@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#primaryimage","url":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg","contentUrl":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/10\/FlyParc-1-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.gsegroup.com\/en\/articles-en\/logistics\/a-transformational-trend-off-site-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.gsegroup.com\/en\/"},{"@type":"ListItem","position":2,"name":"Articles EN","item":"https:\/\/www.gsegroup.com\/en\/category\/articles-en\/"},{"@type":"ListItem","position":3,"name":"Logistics","item":"https:\/\/www.gsegroup.com\/en\/category\/articles-en\/logistics\/"},{"@type":"ListItem","position":4,"name":"A transformational trend : off-site construction"}]},{"@type":"WebSite","@id":"https:\/\/www.gsegroup.com\/en\/#website","url":"https:\/\/www.gsegroup.com\/en\/","name":"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise.","description":"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d&#039;entreprise.","publisher":{"@id":"https:\/\/www.gsegroup.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gsegroup.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gsegroup.com\/en\/#organization","name":"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise.","url":"https:\/\/www.gsegroup.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gsegroup.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/04\/logo_GSE.jpg","contentUrl":"https:\/\/www.gsegroup.com\/wp-content\/uploads\/2024\/04\/logo_GSE.jpg","width":500,"height":250,"caption":"GSEGROUP, Contractant g\u00e9n\u00e9ral en immobilier d'entreprise."},"image":{"@id":"https:\/\/www.gsegroup.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/GroupGSE\/","https:\/\/x.com\/GSEGroup","https:\/\/fr.linkedin.com\/company\/gse","https:\/\/www.youtube.com\/user\/GSEgrouptv"]},{"@type":"Person","@id":"https:\/\/www.gsegroup.com\/en\/#\/schema\/person\/4669bb5f522978bfdfc2c2d10302b836","name":"Ana\u00eblle Stoeri","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/06d45e20e62c55da6df88fc76bc4e73607c2a090cdffc2a3cd189073c5eb6df6?s=96&d=mm&r=g","caption":"Ana\u00eblle Stoeri"}}]}},"_links":{"self":[{"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/posts\/18018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/comments?post=18018"}],"version-history":[{"count":11,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/posts\/18018\/revisions"}],"predecessor-version":[{"id":23314,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/posts\/18018\/revisions\/23314"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/media\/23310"}],"wp:attachment":[{"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/media?parent=18018"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/categories?post=18018"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gsegroup.com\/en\/wp-json\/wp\/v2\/tags?post=18018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}